Steel Cable Tray Roll Forming Machine Production Line

Steel Cable Tray Roll Forming Machine Production Line

Steel Cable Tray Roll Forming Equipment  production line 

one .The cable tray roll forming equipment image for reference:

2.CZPT specification:
2.1Specification:

Substance feeding thickness/mm Forming specificaiton /mm Forming quantity The motor energy The primary function
one.five- three. one hundred*40-600*150 28 15KW Creating cable tray

2.2Working method:
Feeding → CZPT punching → Xihu (West Lake) Dis. → Roll forming → CZPT cutting → Carrier out of product

two.3Configuration:

  • Manually inflatable rack
  • one established of hydraulic punching , push, chopping unit

one )set of main forming equipment

  • one established of assistance frame
  • Forming with 28 working method, using chain wheel transmission
  • Dimensions: 20000×1700×950mm

3) Forming velocity: 6-8m/min Forming model: 100*40-600*one hundred fifty

  • Forming wheel mould content is GCr15 Warmth treatment method hardness is HRC52~fifty five

five) Shaft dimension is¢85 substance is forty five#

  • Rolling reinforcement with a removable reinforced roller The max width is 550mm roller diameter is ¢165
  • CZPT punching and cutting, with one set of 15KW hydraulic motor, three sets of punching moulds and one established of reducing mould.
  • Automated manage: touch display, double encoder, PLC, pneumatic manage.
  • Pressing R element width adjustment: up and down push roller use electric adjustment and encoder management.
  • Urgent straight part width adjustment: two sides of double wall transfer at the identical time, making use of electrical adjustment and encoder manage.
  • With flat gadget, roller diameter is ¢105
  • The body with H metal welding the leading limited variety roller
  • The operate out table with 6m roller type
  • one established of CZPT expansion and horizontal type rack
  • Excess weight : 18T

FAQ roll forming equipment
1)Q:Can you make machine according to my design? 
   A:Yes, we have skilled technical crew to function out the suitable design for you and verify with you right up until you concur.
two) Q: Will you supply the proper items as requested? How can I trust you?
    A: Of course, we will. The main of our firm tradition is honesty and credit history.
three)Q:What payment conditions you settle for?
    A:Frequently is TT, thirty% deposit and 70% before shipment, and at times we can contemplate a lot more for you as for every your ask for.
4) Q:What is the warranty for our equipment?
    A:We have one year assure, and supply whole life’s specialized assistance.

Steel Cable Tray Roll Forming Machine Production Line

Tags: