6m to 10m Aerial Aluminum Single Mast Lift Table Platform

6m to 10m Aerial Aluminum Single Mast Lift Table Platform

6m to 10m aerial aluminum single mast  lift platform

6m to 16m Aluminum Alloy Aerial Perform Male Lift Platform adopts high good quality aluminum alloy to reduce the web excess weight of the body. In this way, aluminum alloy aerial operate man elevate platform will be significantly more less difficult for operator to transfer around. Aluminum perform platform is geared up with 4 substantial power assistance legs, operator have to open up the four assistance legs and change to be stage according to the gradienter. In get to boost the maneuverability, two sets of handle panels are outfitted on the aerial male perform system. A single is on the down side of the body and the other is on the platform. In scenario of electrical power off, aluminum alloy aerial perform male carry platform is made with crisis decline button.  When it electrical power off, screw the emergency button, it will commences lowing down.

One Mast Aluminum Lift Platform is famous for its light fat and higher elevate. It is made of aluminum alloy. So the weight of the merchandise is very mild. Operator can go it around simply. It is commonly utilized in supermarket, manufacturing unit, lodge, cafe,   station, theatre, exhibition hall, indoors and outdoor maintenance.

Introduction Solitary Mast Elevate System:
Relocating by gentleman manully.
Lifting by AC(CZPT battery) electricity or DC(with battery) electrical power

AC: Voltage as for each your local normal.
DC: Battery supply electricity.

Configuration for One Mast Elevate System:
Dual controls procedure
Multi-guide pulley on mast
Dual base system
Chassis with degree gauge
In excess of load safety
24V secure control voltage 
CZPT basic safety protection with leveling stabilizers and outriggers support
No-marking wheels
Reduced maintenance demands will conserve you time and money.

Basic safety of CZPTal and hydraulic Program
Ergonomic control panel, electrical power indicator, electric shock protector, circuit breaker and many others. 
Constructed in stress release valve
Unexpected emergency end buttons are CZPT each on the system and on the reduced situation.
Crisis lowering device 
Broken valve activated automatically to cease the flowing of hydraulic oil in circumstance any pipe damaged.

Specification:

Model No SMA06 SMA08 SMA10
Max. Platform Top mm     6000     8000   10000
Max. Operating Height     8000    10000    12000
Min. Platform Peak                                  580
Ground Clearance                                  60
Carry Rated Potential kg                                 125
System Size mm                             600*550
Outspread Dimension                            2030*1840
CZPTal AC v               as for each customers’ need
Resource DC                                    12
Battery v/Ah                                  120
Charger v/A                                 12/15
Lifting Motor AC v/kw                                 0.seventy five
DC                               1.5Kw
Overall Size mm                                 1420
General Width                                  840
Total Peak 1930
General AC kg 240 300 340
Net Weight DC 260 320 360

Certification:CE ROHS SGS IOS And so forth.

Our Provider:

1.We can style the customerized single mast  lift platform as for every your requirement.

2.The most suited product will be recommended to you as soon as we know about your necessity.

three.Cargo can be organized from our port to your location port.

4.Opetion video can be sent to you if necessary.

five.Servicing online video will be provided after the solitary mast  lift platform break down to help you restore.

six.Areas of single mast  lift platform can be sent to you by express within 7 days if needed.
 
High quality guarantee:
12 Months High quality Ensure with 1 12 months Free of charge CZPT Elements Replacement (Xihu (West Lake) Dis.n triggers excluded)

Bundle and Supply :
Scissor elevate tables will be packed by large high quality bins and place on pallet.
Generation time: about twenty~25days right after obtaining payment.
Loading Port: HangCZPT port, ZheJiang Port, HangCZPT port, HangCZPT Ports.
 

Regularly Questioned Concerns:

1.How can customer  buy parts when it break down?

The one mast  lift system adopt most of the common areas of hardware.You can get the areas in your local components market.

two.How can client mend the one mast carry system.

One of the great gain of the products is with very quite lower failure charge.Even it breaks down,we can guidebook to mend it by video clip and restore instruction.

3.How prolonged is the high quality ensure?

A single 12 months good quality guarantee.If it breaks down inside a single year,we can deliver the elements totally free of demand to you.

 

6m to 10m Aerial Aluminum Single Mast Lift Table Platform

Tags: